TBC won the contract and carried out the electrical work to replace the primary medium- and low-voltage electrical distribution equipment in the Ste-Marie Pavilion of the Centre hospitalier régional de Trois-Rivières, including Hydro-Québec's massifs.
Share
CSSS Trois-Rivières - Pavillon Ste-Marie Lot II
Site location
1991, boul. du Carmel Trois-Rivières (Québec) G8Z 3R9
General contractor / Customer
P.A. Bisson Inc.
3200 4th Street
Grand-Mère, Quebec
G9T 5K5
Related expertise(s)
Electricity
Industry(s)
Institutional
Value by specialty
- Electricity : 1 310 000$