Ultium Cam

For the Ultium CAM battery materials plant project, TBC was commissioned to carry out the ventilation work and complete electrification of the wastewater treatment plant.

Faced with the challenges of this complex project, we adopted an accelerated execution strategy, leading design and construction simultaneously. To guarantee the fluidity of this simultaneous execution, our teams rely on BIM modeling. This technology enables us to coordinate our systems with those of other disciplines in real time, minimizing the risk of interference and optimizing delivery times for this critical infrastructure.

Site location

6056, chemin Louis-Riel, Bécancour (Québec) G9H 4X6

General contractor / Customer

POSCO and GM Canada

Related expertise(s)

Electricity, Ventilation

Industry(s)

Industrial

Value by specialty

  • Ventilation : 34 363 000$
  • Electricity : 1 528 000$