HÔTEL AC – MARRIOTT

TBC was selected to complete the ventilation work in the new 37-floor AC Hotel located in the heart of the Quartier des spectacles in downtown Montréal.

CENTRE AQUATIQUE IQUALUIT

TBC carried out ventilation and electrical work in the new aquatic center located in Iqaluit, Nunavut.

HÔTEL WILLIAM GRAY

TBC was selected to complete plumbing, ventilation and electrical work at a 127-room and suite boutique hotel located in the heart of Old Montréal and overlooking Place Jacques-Cartier.  The new 8-storey project included integrating a glass tower between two historic 18-century buildings, Maison Edward-William-Gray and Maison Cherrier.

MUSÉE NATIONAL DES BEAUX-ARTS DU QUÉBEC

TBC performed plumbing, ventilation and related work during the construction of the new Pierre Lassonde Pavilion at the Musée national des beaux-arts du Québec. The pavilion is located within the Parc des Champs-de-Bataille in Québec City.

HÔTEL ALT MONTRÉAL GRIFFINTOWN – COMPLEXE ILOT 101

TBC carried out plumbing, heating, ventilation and electrical work in a 18-storey commercial, residential and hotel building. Built in accordance with a “value engineering” approach, it houses 205 condominiums and 154 hotel rooms. The real estate project is located in Griffintown, MontrĂ©al.

COMPLEXE DE SOCCER AU CESM

TBC was selected to complete ventilation and air conditioning work in MontrĂ©al’s new soccer stadium located in the Saint-Michel Environmental Complex.